09.02.2019 - Decree of the President of the Republic of Uzbekistan No. PP-3454 - instead of this in Following the visit of the President of the Republic of Uzbekistan Sh.M. Mirziyoyev on January 30-31, 2019, the rehabilitation of the field was initiated in the Jizzakh region.
05.03.2019 - Instruction of the Prime Minister to carry out work on revaluation, development of an investment proposal and search for potential investors for the implementation of the project.
20.05.2019 - Memorandum of Understanding was signed with the State Committee for Geology and Mineral Resources on joint work at the Uch-kulach deposit.
10.07.2019 - Presentation of the investment project at the Ministry of Economy and Industry with the participation of the National Agency for Project Management under the President of the Republic of Uzbekistan, the State Committee for Geology and Mineral Resources and the Ministry of Investment.
17.07.2019 - "Uch-qulach polimetal" FE LLC was established in Jizzakh region, which is the operator of the project and the holder of licenses.
29.08.2019 - Cooperation agreement was signed with the Khokimiyat of Jizzakh region on the implementation of the investment project “Integrated development of the Uch-Qulach polymetallic ore deposit”.
24.01.2020 - Agreement was signed with Mine Database Company LLC for creation of an electronic database based on the results of geological exploration of the Dalniy field and preparation of GAP-analysis.
16.09.2019 - Instruction of the Prime Minister to hold direct negotiations and transfer all geological and project documents to "Uch-qulach polimetal" FE LLC from the Almalyk Mining and Metallurgical Plant.
15.02.2020 - Minutes No. 7 from Advisor to the Prime Minister of the Republic of Uzbekistan A. Sultanov on arrangement of works on preparation and implementation of investment projects on the ore mineral resource base of deposits in the Jizzakh region.
17.04.2020 - Contract No. 3208 was signed for preparation of a technical feasibility study with "Georangmetliti"
10.06.2020 - Contract was signed with CSA Global for mineral resource assessments and conversion of reserves to the JORC system.
15.01.2021 - At our request, JSC "Almalyk MMC" handed over geological materials for the Central and Southern sections of the Uchkulach field, for study and preparation of a database for the subsequent transfer of reserves to JORC.