A brief history of exploration and operation of the Uchkulach deposit    

The Uchkulach lead-zinc deposit has been known since 1930, exploration works on it were carried out from 1947 to 1963.
Studies on ore preparation characteristics from the Uch-Kulach deposit were carried out by various research institutes. In the period 1960-1982, a large volume of both laboratory research and semi-industrial tests was carried out at the experimental shop of the plant.

During the construction of the mine, 1981-1983, all the necessary infrastructure was created, which is mainly preserved at the present time, incl. all social amenity facilities.

Operation of the deposit, the Dalniy quarry began in 1981. Due to the decline in prices for metals (zinc, lead), the development of the quarry turned out to be unprofitable and in 1998, ore mining was suspended, and in 2006 the quarry was closed down.

Currently, no work is being performed at the Dalniy quarry.

 

A supplier of engineering solutions and equipment has been identified for the project

On May 20, 2019, a Memorandum of Understanding was signed between HPO-Service GmbH and the State Committee for Geology on joint work at the Uchkulach field.

The transfer of reserves to JORC is carried out by CSA Global (Australia).

It is planned to involve the Hatch company in the development of the feasibility study.

PFS of the project prepared by the Institute "O'zGEORANGMETLITI"

(for reference: global engineering company Hatch, founded in 1955, HQ Toronto, Canada, a leading international consulting, engineering, technology, information systems and project and construction management company for clients in the mining, energy and infrastructure sectors, with 65 permanent offices, the staff of the company is 8,000 people)

 

A supplier of engineering solutions and equipment has been identified for the implementation of the project

Involved supplier of technological solutions in the field of ore dressing is the CEMTEC company.

(for reference: CEMTEC GmbH (LLC "CEMTEC", Austria) is a world renowned company specialising in technologies for wet and dry grinding of most bulk materials, industrial minerals and ores. CEMTEC supplies both individual pieces of equipment and complete production lines and plants "turn-key". CEMTEC has many years of experience in the development of production processes. Based on the results obtained during the tests, the most energy-efficient and sustainable technological process schemes are developed.

The range of services provided by CEMTEC GmbH includes.
  •   modeling of the production process focused on maximum enrichment and reaching the target productivity,  
  •   confirmation of technical feasibility by laboratory and semi-industrial tests,
  •   calculation of all essential stages of the production process,
  •   assessment of new technologies and systems to ensure energy-saving and environmentally friendly production,
  •   basic and detailed engineering of the developed process,
  •   development of a philosophy of control and regulation with adaptation to technical requirements,
  •   consideration of environmental issues such as dehydration cycles.